Johnston Companies
Home
Home
Home

Magnaflux 01-3625-40 Hydrophilic Emulsifier, 5 gal Pail, Liquid Form, Pink

OKR 387-01-3625-40

Mfr #:01-3625-40

Requires Quote
Magnaflux 01-3625-40 Hydrophilic Emulsifier, 5 gal Pail, Liquid Form, Pink

Magnaflux 01-3625-40 Hydrophilic Emulsifier, 5 gal Pail, Liquid Form, Pink

Requires Quote

OKR 387-01-3625-40

Mfr #:01-3625-40

Description
Designed to remove excess surface penetrant, ZR-10E minimizes surface background during method D fluorescent penetrant testing while protecting indication integrity in critical component inspections. This method D remover reduces fluorescent background on rough surfaces and minimizes penetrant bleed out from hollow parts. ZR-10E is tested and approved to AMS 2644 to work with Magnaflux PE penetrants ZL-2C level 2, ZL-27A level 3 and ZL-37 level 4 for verified penetrant system reliability. ZR-10E provides long tank life and excellent solution consistency for dependable, long lasting performance in a variety of applications. ZR-10E is listed on the QPL SAE AMS 2644 qualified product list and is approved for use by Pratt and Whitney.
Specifications
Item Type
Welding Crack Detection Kit & Components
Manufacturer
Magnaflux
Color
Pink
Composition
Hexylene glycol, Alcohols C10-16 ethoxylated propoxylated
Container Size
5 gal
Container Type
Pail
Flash Point
>93.3 deg C
Form
Liquid
Odor/Scent
Mild
pH Range
Neutral
Specific Gravity
0.9
Viscosity
21.06 to 25.74 cSt
VOC Content
334.65 g/L
Features
  • PE penetrant system is less susceptible to human error since ZR-10E only works with rinse water to remove excess surface penetrant
  • Lower concentration required
  • Resist degradation from bacteria, fungus or other contaminants
  • Tested and confirmed per AMS 2644 to work with Magnaflux PE penetrants for verified penetrant system reliability
  • Maintains solution consistency for dependable performance with minimal agitation
  • Flexible to work with many types of equipment and application methods
  • Inspect a wide range of high value components without fear of corrosion or specification non-conformance
  • Meets all major industry and NDT specification requirements, including aerospace prime and OEM specs
  • Promotes better inspection quality by providing the operator with a more comfortable work environment
  • Reduces discomfort from strong odors
  • Exceeds all EHS requirements
Additional Info
UNSPSC
15121800